At BURNCO, we firmly believe that community growth is directly related to the resilience and continuity of our public spaces. We provide high quality materials and expertise for the construction of structurally sound buildings which serve the public.
BURNCO’s experience with complex projects can be leveraged to meet the unique needs of everything from small office buildings and convenience stores to large shopping malls and industrial distribution facilities.
Residential spaces demand a premium and high-quality construction materials that ensure longevity without compromising the aesthetics. BURNCO’s high-end products offer both qualities and more to meet the specific requirements of apartment complexes, bungalows, villas, and more.
In the healthcare industry, strength and durability are of foremost importance. These buildings range from large multi-storied, multi-specialty hospitals to out-patient treatment centers, long-term care facilities, urgent-care facilities, and medical office buildings.
Tilt Up is a unique construction technique wherein the building’s exterior walls and panels are formed horizontally on a concrete slab. They are then erected and tilted on the building.
With architects increasingly adopting innovative design techniques for their buildings, concrete can prove to be a powerful solution both for its structural strength and as an aesthetic enhancement of the structure. Often these bespoke decorative finishes are integrally cast with a reinforced concrete frame.
High Rise projects are complex with different mixes, specifications, limited road access, minimal lay-down areas, cumbersome pumping configurations, and high-volume requirements. BURNCO’s years of expertise in customizing and tailoring construction solutions for various high-rise buildings have made us the go to experts.
The Charles Schwab Lone Tree Campus was a $240,000,000 mammoth consisting of 3 office buildings of five stories each. These buildings comprise 650,000 square feet of office space, which can accommodate an additional 2,900 workers, with room for more buildings, if needed, on the 47 acres, Charles Schwab owns.
The BURNCO team worked together to ensure the G3 Grain Terminal project was completed without problems. BURNCO conducted test slip form pours to predict the set time and slip rates for the silo construction.
The Judicial Center was built to serve as a 100-year building for the Colorado State Court system. Its design and construction honour the legacy of the state court system while providing a facility that can accommodate the Court's future.
Setting the bar higher by pouring 68,800 yd³ of high-quality concrete for the largest industrial building in Colorado that extends 2,400,000 sq. ft. over 80 acres.
To create a rich and homogeneous surface for this project, we produced a fine-graded mix of approximately 60 metric tonnes of asphalt. This project consisted of a shared twin driveway. Both the owner and contractor were pleased with our product.