Charles Schwab Campus

icon location pin
Location
Texas, USA
icon symbols
PROJECT TYPE
Commercial / Residential
icon clock
PROJECT TIMELINE
31 months
icon ruler
PROJECT SIZE
5 Story Buildings - 650,000 sq. ft.
icon concrete
CONCRETE
47,000cy
icon architecture
ARCHITECT
Fentress
icon user
STRUCTURAL ENGINEER
Martin/Martin
icon user
GENERAL CONTRACTOR
Mortenson Construction
icon user
Concrete CONTRACTOR
Mortenson Construction
icon cement bag
CONCRETE
BURNCO Colorado
The Charles Schwab Lone Tree Campus was a $240,000,000 mammoth consisting of 3 office buildings of five stories each. These buildings comprise 650,000 square feet of office space, which can accommodate an additional 2,900 workers, with room for more buildings, if needed, on the 47 acres, Charles Schwab owns.
The buildings contain large banks of windows, which flood the offices with light, and rooftop gardens. Workstations have desks that rise with the push of a button, allowing workers to sit or stand. There is also a 17,000 sq. ft. two-story retail branch office building. Parts of the campus will be accessible to the public, including dedicated spaces for entertaining clients and job applicants.
An 88,400s QFT amenities building makes this campus top-notch for its employees. This building features a café, a training center, a large cafeteria, and an events garden (amphitheater.) The campus is complete with two parking garages consisting of 1,932 parking stalls for their employees. The design and construction team achieved a sustainable campus attaining LEED Gold and achieved LEED Platinum for the retail branch.
thumb charles schwab campus about 1

Project Challenges

The sheer geographical scope and square footage made a very challenging project, with pours happening on multiple buildings consecutively or simultaneously at times. The scale of the project caused a real void for how to best coordinate with the various teams Mortenson had working on the massive project.
The project had some time-sensitive delivery dates, which made keeping the project schedule vitally important. There were several areas on the project where moisture-sensitive flooring needed to go down extremely quickly after the ready-mixed concrete had been placed.

Project Solutions

BURNCO recognized the project's needs, given its scope and size, by responding with additional personnel to keep the Charles Schwab project moving forward.
We consistently provided a quality control professional on-site and someone to help coordinate the steady stream of mixer trucks on the project daily.
When Mortenson approached BURNCO about the moisture-sensitive flooring issue with the timeline, we came to the table with an innovative solution to the problem. BURNCO offered Aridus concrete in the amenities building to keep the project on schedule with great results.
The Aridus concrete was below 80% relative humidity in 30 days, allowing the moisture-sensitive flooring to be put down without worry or the need of epoxy coating systems, which would have added 7-10 days to an already tight schedule.