Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Walterdale Bridge Replacement

icon location pin
Location
Alberta, Canada
icon symbols
PROJECT TYPE
Public / Government
icon clock
PROJECT TIMELINE
2013 – 2017 Construction
icon concrete
ASPHALT
950 metric tons
icon user
GENERAL CONTRACTOR
Acciona
icon cement bag
CONCRETE
Park Paving
The new bridge will provide three northbound lanes and enhanced cyclist and pedestrian access crossing the North Saskatchewan River.
thumb walterdale bridge replacement about 1

Project Challenges

BURNCO worked with the City of Edmonton and Alberta Transportation's specifications to deliver a quality mix that satisfied both owners. Multiple QC, QA and owner consultants were involved.

Project Solutions

BURNCO was able to offer and supply the required hot mix asphalt designed using Alberta Transportation specifications. These projects require increased attention to quality control to ensure that the mix is produced within the specifications. With the owners doing QA and consultants doing QC, we had more than 12 samples taken of this small quantity which met all requirements.

check out other success stories